Work orders track both time (estimated vs actual hours) and cost (labor, parts, and total). Accurate tracking here is what makes maintenance cost analytics in Reports meaningful.

Time tracking

Estimated hours

Set estimated hours when creating a work order or any time before work starts. Estimates drive scheduling and capacity planning, and give assignees a target.
Not sure how long a job takes? LAYLA AI can suggest a time estimate based on similar past work orders.

Actual hours

Assignees log actual hours against the work order as they work or when they finish. Each time entry records the user, the hours, and the date, so multi-assignee work orders show who contributed what.
Time tracking panel with estimated hours, actual hours entries per user, and a variance indicator

The time tracking panel showing estimated hours and logged actual hours per user

The work order shows estimated vs actual side by side, so variances are visible at a glance.

Cost tracking

Each work order tracks three cost figures:
Cost section of a work order with labor cost, parts cost, and total cost rows

The cost tracking section showing labor cost, parts cost, and total cost

1

Log your hours

Add your actual hours in the time tracking panel. Labor cost updates from the logged time.
2

Record parts used

Add the parts consumed on the job so parts cost is captured against the work order and the linked asset.
3

Review totals before completing

Check labor, parts, and total cost before moving the work order to Completed — costs are much easier to correct before verification and closure.
Costs on Closed work orders are part of the historical record. Make sure hours and parts are fully logged before a work order is verified and closed.

How this data feeds Reports

Time and cost data rolls up into Reports and dashboards:
  • Cost per asset — total maintenance spend for each asset, from every closed work order linked to it
  • Estimated vs actual analysis — how accurate your estimates are, by category, team, or technician
  • Labor utilization — logged hours across your workforce
  • Corrective vs preventive spend — cost broken down by work order type
Report chart showing maintenance cost by asset built from work order cost data

A maintenance cost report built from work order labor and parts data

Work orders with no logged hours or costs appear as zero-cost work in reports, which understates real spend. Encourage technicians to log time on every job, even quick fixes.